- Overview
- Product Description
Basic Info.
Model NO.
66909gt
Part Type
LED Amber Strobe Beacon Light
Compatible Equipment Type
Aerial Work Platform
Compatible Equipment Make
Genie
Part Number
66909gt
Waterproof
IP68
Application1
for Genie Vertical Mast Lift Models Gr-08, Gr-12,
Application2
Fits Genie Scissor Lift Models GS-1530, GS-1532, G
Application3
Fits Genie Boom Lift Models Tmz-34/19, Tmz-50/30,
Quality Level
High Performance
Stock
Enough
Weight
0.5 Kg
Transport Package
Standard Export Packing
Specification
14X10X8 cm
Trademark
HNARL
Origin
China
Production Capacity
500pieces/Week
Packaging & Delivery
Package Size
14.00cm * 10.00cm * 8.00cm
Package Gross Weight
0.500kg
Product Description
Factory Price 66909 66909gt Light power beacon led Strobe light Warning Light
NEW FLASHING AMBER BEACON, WITHOUT HARDWARE | |
Parts No: | GE-66909 |
FOR GENIE VERTICAL MAST LIFT MODELS | GR-08, GR-12, GR-15. |
FITS GENIE SCISSOR LIFT MODELS | GS-1530, GS-1532, GS-1930, GS-1932, GS-2032, GS-2046, GS-2632, GS-2646, GS-2668 DC, GS-2668 RT, GS-3246, GS-3268 DC, GS-3268 RT, GS-3384, GS-3390, GS-4390, GS-5390. |
FITS GENIE BOOM LIFT MODELS | TMZ-34/19, TMZ-50/30, TZ-34/20 |
Packing Specifications: | |
Length (mm) | 140 |
Width (mm) | 100 |
Height (mm) | 80 |
Weight (kg) | 0.5 |
Voltage | 12-80V DC |
Beam | Amber, blue .red .white available |
Beam Pattern | 4 kinds of flash pattern and 360 degree light distribtion |
Lens | PC lens |
Lens color | Clear or Amber |
Mount | two bolts |
Waterproof | IP68 |
Operate temperature | -40 ºC to 80 ºC |
Warranty | 1 year |
Certification | ECE R65, IP68,CE,ROHS |
Product Delivery | Shipping Time | Start & End | Descriptions |
By Express. DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect | 3-8 working days | Door to Door | For Small order, Sample order, Trial order Fast & Convenient |
Air Transportation By Plane | 5-10 working days | Door to Airport | For Medium order Fast & Cheaper than express The consignee needs to take delivery at the airport |
Sea Transportation By Vessel | 20-45 days | Door to Seaport | For Mass order Cheap but take time The consignee needs to take delivery at the seaport |
FAQ
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.
Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.